Chrysler Group LLC Announces Production Start at Seven North American Assembly Plants

Posted on 17. Jun, 2009 by webmestre in North America

Chrysler Group LLC Announces Production Start at Seven North American Assembly Plants

Chrysler Group LLC Announces Production Start at Seven North American Assembly Plants

Auburn Hills, Mich., Jun 17, 2009  -  One week after finalizing its global strategic alliance with Fiat Group, Chrysler Group LLC announced today that it will resume volume production of vehicles with the start up of seven of its North American assembly plants the week of June 29, 2009.

As part of a phased production ramp-up, the following assembly plants are scheduled to resume production at the end of the month:

* Sterling Heights Assembly Plant (Sterling Heights, MI) – Chrysler Sebring and Dodge Avenger
* Warren Truck Assembly Plant (Warren, MI) – Dodge Ram and Dodge Dakota
* St. Louis North Assembly Plant (Fenton, MO) – Dodge Ram
* Toledo Supplier Park (Toledo, OH) – Jeep® Wrangler and Jeep Wrangler Unlimited
* Brampton Assembly Plant (Brampton, Ontario, Canada) – Chrysler 300, Dodge Charger and Challenger
* Windsor Assembly Plant (Windsor, Ontario, Canada ) – Chrysler Town & Country and Dodge Grand Caravan
* Toluca Assembly Plant (Toluca, Mexico) – Dodge Journey and Chrysler PT Cruiser

Chrysler Group’s Powertrain and Stamping facilities that supply these assembly plants will also be operating. Chrysler’s Conner Avenue Assembly Plant, which builds the Dodge Viper, resumed production on June 15.

All Chrysler Group plants will be closed during a previously announced two-week Summer Break the weeks of July 13 and 20.

Re-start of production at other Chrysler Group assembly plants will be announced at a later date.
Source Chrysler Group LLC


Related posts:
  1. Chrysler Group LLC Announces Organizational Structure Focused on Chrysler, Jeep®, Dodge and Mopar® Brands Chrysler Group LLC Announces Organizational Structure Focused on Chrysler,...
  2. Bring on the clunkers…Chrysler says! Chrysler Group LLC Announces New “Double CA$H For Your...
  3. Chrysler Group LLC Announces Production of Minivans for International Markets Chrysler Group LLC Announces Production of Minivans for International...
  4. 2011 Buick Regal to be built at the Oshawa Car Assembly Plant 2011 Buick Regal to be built at the Oshawa...
  5. Chrysler Group LLC Introduces Fiat’s 1.4-liter, In-line 4-cylinder, Fully Integrated Robotized Engine with Multiair Technology to Powertrain Lineup Chrysler Group LLC Introduces Fiat’s 1.4-liter, In-line 4-cylinder, Fully...

Tags: , ,

No comments.

Leave a Reply